5 tanks installed, PMTs tested, and filled with water in 3 days.
23 pre production tanks are now in the fields, all PMTs working, and 20 filled with water.
5 tanks were installed on that day, 3 had their PMTs tested, 2 were filled with water. A day full of activities!
3 tanks had their PMT tested (one was retested, battery low on the previous trip), and 2 filled with water
![]() | The air force filling a tank |
![]() | ??? |
![]() | Checking Thaïs on the way back for the next day |
Last tank filled, and 2nd try for Thaïs... Thaïs 2 - Auger 0.