September deployment

5 tanks installed, PMTs tested, and filled with water in 3 days.

23 pre production tanks are now in the fields, all PMTs working, and 20 filled with water.

23 september

5 tanks were installed on that day, 3 had their PMTs tested, 2 were filled with water. A day full of activities!

Before leaving the AB
After the 6 solar pannel rivets broke on one tank
Everybody at the same place at the same time
Slightly later, the trailer on the northern stake
Ground preparation with horses
Tank deployment with horses
A horse
3 tanks installed, waiting for 2 more
Same place, same activity
Ready to deploy last tanks
Last tank deployed before sun goes down

24 september

3 tanks had their PMT tested (one was retested, battery low on the previous trip), and 2 filled with water

The air force filling a tank
???
Checking Thaïs on the way back for the next day

25 september

Last tank filled, and 2nd try for Thaïs... Thaïs 2 - Auger 0.

Getting stuck near Thaïs (Part I)
Getting stuck near Thaïs (Part II)
Gardening near Thaïs
What a wonderful world (I)
What a wonderful world (II)